energy storage

20 kW / 107.52 kWh Air-Cooled Energy Storage System

An outdoor air-cooled lithium battery storage system with verified 20 kW power and 107.52 kWh nominal energy ratings.

  • 20 kW rated power
  • 107.52 kWh nominal energy
  • Air-cooled thermal management
  • IP54 enclosure rating
Rated power
20 kW
Nominal energy
107.52 kWh
Nominal DC voltage
384 V
Cell capacity
280 Ah
20 kW / 107.52 kWh Air-Cooled Energy Storage System

Product overview

This power-to-energy ratio may suit lower-power, longer-duration site objectives, subject to load-profile review and confirmation of usable energy, controls, and interconnection requirements.

Configuration note: nameplate values help define the starting point. Final usable energy, interfaces, operating limits, document scope, and commercial terms are confirmed for the specific project.

20 kW rated power

Review this attribute together with the complete system, destination requirements, and operating conditions.

107.52 kWh nominal energy

Review this attribute together with the complete system, destination requirements, and operating conditions.

Air-cooled thermal management

Review this attribute together with the complete system, destination requirements, and operating conditions.

IP54 enclosure rating

Review this attribute together with the complete system, destination requirements, and operating conditions.

Key specifications

20 kW / 107.52 kWh Air-Cooled Energy Storage System — published technical data
ParameterValueCondition or note
Rated power20 kWConfirm final operating conditions in the project proposal.
Nominal energy107.52 kWhConfirm final operating conditions in the project proposal.
Nominal DC voltage384 VConfirm final operating conditions in the project proposal.
Cell capacity280 AhConfirm final operating conditions in the project proposal.
Thermal managementAir coolingConfirm final operating conditions in the project proposal.
Enclosure ratingIP54Confirm final operating conditions in the project proposal.

Applications to evaluate

Small commercial energy management

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

Longer-duration site support

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

Solar self-use and controlled backup

Validate the duty cycle, site, interfaces, and operating objective before confirming model suitability.

Selection and engineering notes

  1. Check that the 20 kW output covers the coincident loads assigned to the system.
  2. Model the target operating duration from usable rather than nameplate energy.
  3. Confirm noise, airflow, ambient limits, service clearance, and dust exposure for the installation.

Frequently asked questions

What buyers ask before specifying a battery system

Answers cover the information needed to confirm configuration, operating conditions, documentation, price, and delivery.

What information is needed to size a battery energy storage system?
Provide the load profile, target power and energy duration, grid or generator constraints, installation environment, operating temperature range, and the functions the system must perform. A single capacity figure is not enough for responsible system selection.
When should I consider air-cooled or liquid-cooled energy storage?
Cooling selection depends on system size, heat density, ambient conditions, enclosure layout, service access, and the project performance target. Compare the complete thermal design rather than choosing from capacity alone.
Is nameplate energy the same as usable energy?
Not necessarily. Usable energy depends on the permitted state-of-charge window, operating conditions, conversion losses, control strategy, and project limits. Ask for both nominal and usable values in the final proposal.
What safety information should a BESS proposal include?
A project proposal should identify the cell chemistry, electrical protection, BMS architecture, thermal management, enclosure rating, fire strategy, emergency isolation, monitoring, installation limits, and the standards required by the destination project.
Why are prices not published on the product pages?
The listed products are project-configured B2B systems or battery series. Pricing depends on configuration, quantity, accessories, packaging, destination, and commercial terms, so the website does not publish placeholder or zero-value prices.
What is the production and delivery lead time?
Lead time is confirmed only after the configuration, quantity, compliance documents, packaging, and destination are known. No fixed lead-time promise is made on this website because these inputs materially change the schedule.

Discuss the 20 kW / 107.52 kWh ESS

The inquiry keeps this product context attached, so the receiving team can see which specifications and application triggered the request.