OEM & ODM support

Turn an OEM or ODM idea into a controlled production program

Define the application, specification, design responsibility, validation, compliance, approved samples, packaging, commercial terms, and change control before production release.

Program definition

Six gates before production release

01

Application brief

Load or vehicle, duty, environment, interfaces, destination, quantity, schedule, and success criteria.

02

Controlled specification

Model identity, electrical and mechanical limits, drawings, communications, labeling, documents, and revision ownership.

03

Feasibility review

Architecture, cells or plates, BMS, enclosure, connectors, charger or PCS, test scope, tooling, and supply risks.

04

Prototype and validation

Approved sample, test plan, acceptance criteria, failure response, records, and any destination-specific evaluation.

05

Commercial release

MOQ, tooling, lead-time basis, pricing assumptions, warranty document, packaging, forecast, and responsibility matrix.

06

Change control

Approved revisions, component substitutions, notification, revalidation triggers, traceability, and final release evidence.

Prepare a controlled OEM or ODM brief

The first review can identify missing inputs and separate standard configuration from true engineering change.